Hello
One of my clients wants to switch to cluster environment.
Their DB server reside on Windows 2012 R2 and SAP ASE 15.7 SP135. They have six additional application servers. DB server has 64 CPU cores and 256 GB RAM with 2.5 TB of DB space occupied. Application servers have 16 CPU and 64 GB RAM.
How can I switch it to MSCS environment with minimal downtime? What is the best practice about it?
I know I can do with system copy but it will take too much time (around 4 days).
Best regards